Strategic Analysis of an Electricity Deficit in British Columbia

Date created
2015-08
Authors/Contributors
Author: Adam Brooks
Abstract
The British Columbia (BC) Government introduced the Clean Energy Act in 2010. With the new legislation, BC Hydro has been mandated to be electricity self sufficient by 2016. BC Hydro may not have enough generation capacity to meet the regulatory requirement in time. This project explores three potential options for Teck’s Zinc Smelter to provide made-in-BC generation capacity to BC Hydro. After evaluating the options, this author recommends for Teck to make an offer to swap BC Hydro’s imports with Teck’s made-in-BC generation.
Document
Description
EMBA Project - Simon Fraser University
Copyright statement
Copyright is held by the author(s).
Permissions
You are free to copy, distribute and transmit this work under the following conditions: You must give attribution to the work (but not in any way that suggests that the author endorses you or your use of the work); You may not use this work for commercial purposes.
Scholarly level
Peer reviewed?
No
Language
English
Download file Size
Adam Brooks.pdf 960.15 KB

Views & downloads - as of June 2023

Views: 0
Downloads: 0