Skip to main content

Improved Management of Major Shutdowns at Trail Operations

Date created
2011
Authors/Contributors
Abstract
The KIVCET and the zinc roaster plants at Trail perform major maintenance shutdowns to ensure safe and reliable production. These events are very resource intensive and have a significant impact on production. Previous shutdowns have resulted in significant safety, hygiene, and environmental difficulties. Effective management of these events is important to the success of Trail Operations. In this paper, I analyze existing practices to identify some of the major problems that impede performance. I then provide a number of recommendations to improve shutdown management at Trail based on recognized best practice. This paper concludes with an implementation plan that is performed by shutdown practitioners and plant management, working under the guidance of a senior level steering committee.
Document
Description
EMBA Project-Simon Fraser University
Copyright statement
Copyright is held by the author(s).
Permissions
You are free to copy, distribute and transmit this work under the following conditions: You must give attribution to the work (but not in any way that suggests that the author endorses you or your use of the work); You may not use this work for commercial purposes.
Scholarly level
Peer reviewed?
No
Language
English
Download file Size
Tom de Groot.pdf 513.06 KB

Views & downloads - as of June 2023

Views: 0
Downloads: 0